Project Description:
Metroplaza has integrated with different innovative installed to optimize service for everyone. Thanks to these advanced technologies, we established a data-driven ecosystem that enhances safety, promotes sustainability, and strengthens operational resilience in our daily operations that can significantly elevate workplace productivity and foster a more efficient and modern work culture.
Estimated Savings
Savings Narrative
Manpower saving per year: Average manpower cost $20,000 HKD, 2 numbers of manpower could be saving from advanced technologies. Results: 20,000HKD x 12months x 2 = 480,000/7.83 = 61,303 USD
Energy saving:
From Plantpro and solar film: 593,058.8 kWh 227,225.6 USD (Referring to ppt Page.20) From PV system: annual power generated from Tower 1 and shopping arcade are:
14,890.8 + 19,056.6 =33,947.4 kWh (Accounting 4 HKD/kwh in FIT program) approximated 135,790 HI<D = 17,340 USD were saving per year
Net Operating Cost Savings per year: 350,869 USD
Kilowatt-hours Savings per year: 627,006.2 kWh
Carbon Emissions Offset: (627,006.2 x 0.38 ) / 1000 = 238.26 tons C02e